Our Projects /
Objective
The objective of the project was to support the removal of the arc loop and modernise the signalling system with minimal disruption to network operations.
Scope of Works
Our team supplied all labour, equipment and materials required for the installation of the rail signalling infrastructure.
This included:
Project Outcome
The project was delivered on time and to a high standard, with all rail signalling assets installed and completed within an 8 month timeframe. Integration with existing systems was seamless and all works met required safety and performance standards.
Get in touch with our team to discuss your requirements and see how we can support your next project.
Get in Touch